Josh

936 posts

Josh banner
Josh

Josh

@joshfre44

London, England Katılım Ocak 2018
486 Takip Edilen461 Takipçiler
Josh
Josh@joshfre44·
@doc7austin My word, that is quite something!
Josh tweet media
English
0
1
11
295
doc7austin
doc7austin@doc7austin·
A new direct train connection between Berlin and Trieste! The ÖBB Nightjet NJ 457 from Berlin to Graz is coupled with the Railjet Xpress RJX 137 from Vienna to Trieste between Vienna and Graz. That means you only need to change cars once — no platform change required!
doc7austin tweet media
English
2
6
53
3.1K
BMLBod
BMLBod@BMLBod·
@matthewhodg Particularly with Gatwick’s expansion now approved (subject to any legal challenges) and continued population growth in the BML commuter towns.
English
1
0
8
1.1K
Matt HB - matthodg.bsky.social
Matt HB - matthodg.bsky.social@matthewhodg·
CARS is just about the most essential rail scheme south of London and yet it was quietly sidelined by the Johnson government. Really need this to get back on track to fully unlock the potential of the BML and all its connecting lines! #Echobox=1773945975" target="_blank" rel="nofollow noopener">mylondon.news/news/transport…
Matt HB - matthodg.bsky.social tweet mediaMatt HB - matthodg.bsky.social tweet mediaMatt HB - matthodg.bsky.social tweet media
English
6
19
202
21.5K
Josh
Josh@joshfre44·
@trainfanmatt Sadly, not a new thing. That used to be my local line, we never had any luck getting the 1Bxx to stop additionally. The operator was also pretty rubbish at holding the stopper for those connections. Lots of factors at play though, tight unit turnarounds / lack of recovery etc
English
0
0
2
2.9K
Matt
Matt@trainfanmatt·
I honestly despise this sort of response to cancellations. Like it is acceptable for people to have to stand around waiting an extra hour, delaying their plans for the day, because train companies are incapable of running their scheduled services
NORTHERN 🚆@northernassist

@EthanAfro There is an hourly service for this journey.

English
24
159
8K
355.2K
Josh
Josh@joshfre44·
@AndyBTravels @northern We used to have a ~0355 Airport train from Preston (ex Blackpool), admittedly not stopping at either Wigan or Bolton on the way, owing to station opening hours. That was the bees knees. First train is now some 90 minutes later…
English
0
0
4
374
AndyBTravels
AndyBTravels@AndyBTravels·
The first @northern train from Bolton to Manchester Airport is at 05.54 arriving 06.31. I do wonder if an earlier train to arrive 06.00 or earlier would work - maybe test market with a bus at 05.00 arriving 05.45. Good for people starting work at 06.00 and make flights from 08.00 accessible rather than the current 08.30 flight timeline, assuming 2 hour check in.
English
3
1
17
7.1K
Josh retweetledi
Gregor 🌹🇪🇺🇦🇹
Gregor 🌹🇪🇺🇦🇹@salingergregor·
it's actually possible to have trams and Erasmus
Gregor 🌹🇪🇺🇦🇹 tweet media
English
28
69
3.2K
73.3K
Josh
Josh@joshfre44·
@O_TTravels The Italian flag, but it’s just a 12 car 387 🇮🇹
English
1
0
1
217
O.T Travels
O.T Travels@O_TTravels·
A new liveried Class 387 has joined GTR (Southern). 387173 has moved from Great Northern to Southern with the Great Western Railway livery! The 3rd different 387 livery for GTR, would be great if there was a 12 carriage 387 with 3 different liveries (GN, GWR, GX)
O.T Travels tweet media
English
6
2
31
16.4K
Josh
Josh@joshfre44·
@daveg Very few of these are new announcements / new high speed lines. Lots of the routes are already being built / exist anyway, this is more about service enhancements and smaller upgrades (some of which are already in planning, such as the direct Berlin - Rome service)
English
1
0
5
3K
Sean M 🌈✈
Sean M 🌈✈@SeanM1997·
BA CityFlyer to cut 2 routes, with flights ending by 28 March 2026: 🇬🇧London City - 🇩🇪Düsseldorf 🇬🇧London City - 🇩🇪Frankfurt
Sean M 🌈✈ tweet media
Deutsch
8
10
112
32.7K
Josh
Josh@joshfre44·
@O_TTravels @1MacKinnon Pre-Covid, the ‘proper’ timetable had the 1Mxx fast London departing Glasgow at xx:40, and the 9Mxx West Mids departing at xx:00. Sadly, this has been considerably eroded and departures moved earlier. This increases overall journey times, as the timings south of PRE have remained
English
2
0
1
86
O.T Travels
O.T Travels@O_TTravels·
@1MacKinnon It is strange how it doesn't leave later, I'm not sure why that is. Although the faster service skips Penrith giving the slower service more of a gap
English
1
0
1
244
Josh
Josh@joshfre44·
@nonstopeurotrip They are absolutely fantastic trains. A showcase to other manufacturers of what is possible out of a high speed EMU. Look forward to seeing Westbahn’s sets next year.
English
1
0
2
75
Josh
Josh@joshfre44·
@seatsixtyone @driverbod125 I bloody love Regiojet, but PKP’s offer (non-Pendolino at least) can be unbelievably cheap right up to the day of travel too. Competition here, where prices are already relatively low, will be interesting to see play out.
English
0
0
0
86
The Man in Seat 61
The Man in Seat 61@seatsixtyone·
Krakow to Warsaw for €2.10 has got to be some sort of record, surely? Private operator Regiojet is expanding into Poland, they've run 1 train per day since September, increasing to 8 trains a day from December. They'll also run trains from Warsaw to Poznan, Gdansk & Gdynia.
The Man in Seat 61 tweet media
English
11
11
263
19.8K
Josh
Josh@joshfre44·
@sme_eef Had to zoom in on the name badge there
English
1
0
1
56
Josh
Josh@joshfre44·
@O_TTravels @lbmjason Absolutely. I worked onboard many Azuma runs which did LDS-KGX in under 2hrs, and on 3 occasions even did it as fast as 1hr 52-53ish. This photo from 08/06/24 (a near perfect run) is our time from wheels turning at WKF to coming to a stand at KGX, under 1hr 39! Incredible stuff.
Josh tweet media
English
1
0
4
88
O.T Travels
O.T Travels@O_TTravels·
@lbmjason Wonder if it's possible to do it even quicker with the Azuma
English
2
0
2
933
O.T Travels
O.T Travels@O_TTravels·
Since when did LNER run this service 👀??? Leeds to London King's Cross in just under 2 hours!! Really really wish Intercity services like this were consistent and ran hourly!
O.T Travels tweet media
English
8
1
100
16.1K
Josh
Josh@joshfre44·
@robbie_burgess @philatrail Interesting stuff - is this a relatively new change Robbie? I remember boarding a set that had arrived ex Doncaster depot a few years back, and it did seem a little bit ‘tight’ for the signal once the driver had changed ends
English
0
0
0
65
Random_Robbie
Random_Robbie@robbie_burgess·
@philatrail ‘Platform 3 - Formations of 9 or 10 car class 80x cannot be planned to stop in the DOWN direction as there is no stop board, hence rear passenger doors will be beyond the usable length of the platform’ as quoted in the TPR’s on the Network Rail website.. networkrail.co.uk/industry-and-c…
English
1
0
4
490
Philip Haigh
Philip Haigh@philatrail·
Not sure what happened last night at York when my 2100 1N34 King’s Cross-Newcastle rolled to halt with every through platform filled. Even when P3 cleared we still waited and eventually got in P9. Our slight delay around Retford turned into a delay-repay 30 late. Pix: Traksy.
Philip Haigh tweet media
English
5
2
48
7.8K
Josh retweetledi
Simon Weller
Simon Weller@SimonWeller·
The things you see whilst trying to get home.
Simon Weller tweet media
City of London, London 🇬🇧 English
15
14
189
16.3K
Josh
Josh@joshfre44·
@davwheat_ @RAIL It’s been no secret that the sets were to be reduced in length in advance of the December 2025 timetable change (for enhanced performance). I’m not sure what this article is trying to achieve by citing cost cuts.
English
1
0
3
81
David Wheatley
David Wheatley@davwheat_·
@RAIL They already did this, and one ran in service on Sunday...? It's for performance reasons, to more closely match that of an Azuma, rather than primarily cost.
English
1
0
4
259
Josh
Josh@joshfre44·
@thomasforth Bloody hell. I remember them demolishing what was once there not so long ago, that looks splendid
English
0
0
2
402
Tom Forth
Tom Forth@thomasforth·
One of Leeds' newest triangle buildings is being unsheathed. 2020s urban renewal looks so much better than 90s and 00s urban renewal. Looking forward to seeing what they do with the ground floor units.
Tom Forth tweet media
English
21
12
328
22.3K
Josh
Josh@joshfre44·
@gomedia91 Superb design and would love to see it rolled out at pace, beats a simplistic green thing. But you make a very fair point, it doesn’t exactly blend in at Abergavenny!
English
0
0
1
181
G
G@gomedia91·
While it's great to see a standardised accessible footbridge design that can be implemented across the network - in the case of Abergavenny, I would have preferred brick or local stone used to compliment the grade II listed station building, rather than industrial grey metal.
G tweet mediaG tweet media
Wales & Borders // Cymru a'r Gororau@NetworkRailWAL

♿🚆For the first time, passengers can cross platforms without steps via our new covered ‘Beacon’ footbridge at #Abergavenny Station - a UK first!🇬🇧 Sleek, modular & accessible for all #WalesandBorders 🙌Read the full story👉 tinyurl.com/3cdx7rka

English
3
0
26
2.5K
Josh
Josh@joshfre44·
@AndyBTravels @northernassist There used to be a far earlier train (pre-0400) from Blackpool and Preston, alas it was fast from Preston to Piccadilly though
English
0
0
1
107
AndyBTravels
AndyBTravels@AndyBTravels·
The first @northernassist train of the day from Bolton into Manchester is the 05.54 to Manchester Airport - quite a few passengers. Wonder if there is a demand for an earlier train?
English
5
0
33
4K
Josh
Josh@joshfre44·
@O_TTravels WCML ‘two track’ times. So no overtaking, everything is pathed to simply follow each other. All trains during these periods have sufficient time for them to run on the slow lines, but with all the adjustments needed to cross back and forth between fast / slow at each junction
English
0
0
5
605
O.T Travels
O.T Travels@O_TTravels·
How have Avanti managed that 🤣🤣!! A 32 min delay cut down to 7! Expected to be 2 mins by the time it gets to Preston. Pathed for the fast line as well
O.T Travels tweet media
English
16
1
55
7.8K