Prathamesh Sawant🇮🇳

9.3K posts

Prathamesh Sawant🇮🇳 banner
Prathamesh Sawant🇮🇳

Prathamesh Sawant🇮🇳

@sarcaskar

Mumbaikar, Engineer, Automation, Robotics, Transportation, Infra, Sarcasm & Optimism is my forte😜

MUMBAI Katılım Nisan 2012
1.7K Takip Edilen965 Takipçiler
Prathamesh Sawant🇮🇳 retweetledi
Amαr 🇮🇳
Amαr 🇮🇳@Amarrrrz·
HCC’s joint venture with Aakshya has won a ₹1,662 crore BMC contract for Phase IV of the Goregaon Mulund Link Road (GMLR) project in Mumbai. The project will improve east-west connectivity and help reduce congestion. It includes a 1.33 km second-level flyover, 3.2 km of at-grade roads, 2.62 km of free-left roads, a 2.4 km cloverleaf interchange, 3.6 km of bypasses, and a 180 m cable-stayed span with 270 m ramps.
Amαr 🇮🇳 tweet mediaAmαr 🇮🇳 tweet mediaAmαr 🇮🇳 tweet mediaAmαr 🇮🇳 tweet media
English
2
16
139
4K
Prathamesh Sawant🇮🇳 retweetledi
ANDHERI LOKHANDWALA OSHIWARA CITIZEN'S ASSOCIATION
Mrinal Tai Gore Flyover Extension 🌉 🌁 Deadline April 26 May is more realistic target 80% work completed Proj started 2019 Took 7.5 years ⏲️ 24 month excl monsoon ⏳️ Will Decongest traffic & faster WEH access to & fro @amitandon @TheVishalKay @AAPJogeshwariE @mashrujeet @dhruvbhim @keshda @prince_man11 @rishi75 @Explorer_Yash @gau_dab @sssaaagar @BHiren @MandarSawant184 @saurabh5620 @Maha7Arindam @sarcaskar @RahulChels @Shaikh_Mohsin12 @Kun_Srivastav @cbdhage @marinebharat @Sahilinfra2 @IndusFederalist @haldilal @nnatuTOI @akshaywcam1 @richapintoi VC @Kneeche
English
8
18
77
6.2K
DRM Mumbai CR
DRM Mumbai CR@drmmumbaicr·
In the league of outstanding performance by imposing more than Rs. 1 Crore penalty on ticketless passengers... The unstoppable Mumbai Division ticket checking staff continues to break records and set new benchmarks! CTI Shri Pravin B. Menthe has achieved an outstanding milestone- Penalised 11,559 ticketless passengers with ₹ 1,00,06,230/- penalty! A truly remarkable performance, reflecting dedication, consistency, and excellence. Kudos on this exceptional achievement!
DRM Mumbai CR tweet media
English
46
28
212
10.4K
Prathamesh Sawant🇮🇳 retweetledi
BJP
BJP@BJP4India·
Under PM @narendramodi's decisive leadership, India has finally paid off the huge ₹3.23 lakh crore "credit card bill" left by the Congress-UPA regime for petrol & diesel consumed 15-20 years ago! ⛽💳 For years, debates on petrol prices focused only on today’s retail price. But the real story lies in something called Oil Bonds. ⛽💳 Here’s the economic autopsy. 🧵
BJP tweet media
English
382
1.7K
4.2K
424.1K
Prathamesh Sawant🇮🇳 retweetledi
Hiren
Hiren@BHiren·
Mumbai Coastal Road Promenade Missing link moves ahead.. Nashik based Forcon Infra bags contract from BMC for construction of Promenade Road incl. cycle track from Lotus Jetty to Baroda Palace in Worli. Order Value: ₹10 cr Length: 320m Completion: 6 months 📷: @RahulChels
Hiren tweet media
English
4
18
182
9.3K
Athreya Shetty 🇮🇳
Athreya Shetty 🇮🇳@shetty_athreya·
Work has begun on my 'First Look' at #Monsoon2026. Report will be out in 2 weeks. At this stage, worth pointing out that we haven't seen a 'Bad' Monsoon season in a long time, so we are due for a poor season! Nature balances out always. Based on the analogues I've dug out, in the last 11 yrs, only 2 yrs have been bad performing seasons for West Central India - 2015 infamous for Super #ElNino drought yr and the weak El Nino year of 2023. However, post the drought of 2015, El Nino has not affected us significantly with +IOD often offsetting impact, as the El Nino relationship is weakening in recent years, while #IOD relationships are getting stronger. Let me be clear - this is NOT to say that 2026 will see catastrophic droughts in the country, but the graph seems skewed towards a Below Normal season.
English
13
13
139
6.5K
Prathamesh Sawant🇮🇳 retweetledi
InfraStory
InfraStory@marinebharat·
Indian Railways to energize Nilje - JNPT section of WDFC from 25 March This is the last remaining section of ambitious DFC project
English
2
28
410
7.5K
Prathamesh Sawant🇮🇳 retweetledi
Haldilal
Haldilal@haldilal·
After three years of work and one year of delay the opening of Gorai's Mangroves parkseem to be near with 800 metre trail, nature center with museum and observatory at Mumbai. Architect: Devendra Bawdane. Promoter: Status: Near Completion. Completion: 2025. Opening: 2026.
Haldilal tweet mediaHaldilal tweet mediaHaldilal tweet mediaHaldilal tweet media
Haldilal@haldilal

India's First Mangrove Park. The 800 meter long broad walk without any trees cut down, Nature Centre, museum, Bird Observatory at Gorai, MUMBAI. Architect: Devendra Bawdane. Promoter: Status: Near Completion. Completion: 2023. Total Investment: 27 crore plus. 📷: Nimesh Dave.

English
5
31
262
11.7K
Mumbai Rains
Mumbai Rains@rushikesh_agre_·
@sarcaskar Not activism. Just sharing ground updates. That's all.
English
1
0
6
438
Mumbai Rains
Mumbai Rains@rushikesh_agre_·
Cutting & trimming of Mangroves for the Mumbai Coastal Road (North) project began today at Charkop, Kandivali. Around 45,000 mangroves will be impacted, of which nearly 9,000 will be permanently removed.
Mumbai Rains tweet media
English
46
243
782
48.3K