


FlyIt
932 posts

@FlyItRealFast
I’m an engineer. I believe all technology should be both ergonomic and intuitive. Megastructure Fan. We must develop a strong AI. Ad Lunam, Martem, et Stellas.











Endeavoring for not just one, but TWO Moon landings in 2028. Coming weeks: Artemis II around the Moon Mid-2027: Artemis III rendezvousing with one or both HLS providers, testing space suits in low Earth orbit Early 2028: Artemis IV lunar landing Late 2028: Artemis V lunar landing, beginning work on lunar base This is how we get back to the Moon with urgency, to stay.









I think we should be littering the Hellas Planitia with O2, H2O, and food. These staples need to be there before the first crewed mission lands. We have optimum C3 windows coming up on 10-31-2026 and on 12-02-2028. We need to launch as much essential consumable tonnage to Mars as is humanly possible during these windows. A crewed mission can then follow on 02-23-2031 and again on 04-28-2033. Falcon 9, could drop small amounts, and Falcon Heavy could drop larger amounts. The proven Atlas V/Centaur could be recalled to service. Vulcan/Centaur V could certainly also be used for this task. You could use a parachute and retro rocket landing system to protect the consumables. Each dropped container would have a beacon so future missions can locate the supplies. The launch window is about four weeks long, and is centered on the dates listed above. Ideally, you would have several launches clustered around each of the next two launch windows. We need to push hard to make this happen! I generated an image and video using Grok Imagine. Still having trouble getting it to do what I want. Background is easy, colors are easy, details are difficult. Any way, I made the lander and parachute teal for high visibility on the Martian surface. @CrainTim @Jason_Lil_Kim @SpaceX @elonmusk @ulalaunch @torybruno @NASA_Marshall @NASAJPL @NASAAdmin 🙏 🇺🇸 🚀 🦾



