Changeindia
6.9K posts

Changeindia
@Changeindia20
Call out to the indian govt to wake up and change. The infrastructure is miserable and garbage situation even worse. We don't accept it and we won't.











As a precautionary measure during the rainy season, the Bengaluru Central City Corporation is carrying out repairs by removing silt from the footpaths from Swami Vivekananda Metro Station to the northern part of Halasuru Lake to allow water to flow smoothly.















Indlawadi International Stadium, Bengaluru(Anekal) Capacity: 80,000 No. Of Pitches – 9 Nos. I. Main Pitches – 5 Nos. II. Practice Pitches – 4 Nos. Bowl to Bowl Distance: 154.9M X 154.9M Estimate Cost: 944Crores @siddaramaiah @DKSureshINC @DKShivakumar @MLAShivanna


🚨KHB has invited Tender for Construction of 80,000 seater New Bengaluru International Cricket Stadium, Suryanagara 4th Phase, Anekal, Bengaluru (Bengaluru’s second stadium) Cost: 943.46 Cr Credit: @BhatAnvesh 1/2



















