dinesh (evm/acc) 🇮🇳

1.8K posts

dinesh (evm/acc) 🇮🇳 banner
dinesh (evm/acc) 🇮🇳

dinesh (evm/acc) 🇮🇳

@dineshcodes

onchain Katılım Ağustos 2022
2K Takip Edilen2.4K Takipçiler
arjun
arjun@4rjunc·
ordr is seeking
arjun tweet media
English
3
0
46
2.2K
winit
winit@hiwinit·
hello there! i got a job. i'll be joining @niledatabase as a founding engineer, which means I GET TO WORK ON DATABASES FOR A LIVING. i've been and i'm really excited for this. feels like a rare opportunity to work on infra like this full-time with a team that's deeply strong at what they do. i could not think of a better way to learn and to start my professional career. thanks so much @gwenshap and @sriramsubram for this. we're so so so back.
winit tweet media
English
35
2
320
12.2K
dinesh (evm/acc) 🇮🇳 retweetledi
Dhanesh Gianani
Dhanesh Gianani@dhanesh500·
The ultimate hack : > A remote job > Earn 2 Lakh per month > Apply Sec 44ADA (50% taxable) > Tax paid is zero Even CA’s dont tell you this
English
118
179
3.8K
445K
dinesh (evm/acc) 🇮🇳 retweetledi
Francesco Ciulla
Francesco Ciulla@FrancescoCiull4·
If you are looking for a job in Developer Relations, we are looking for two Developer advocates at @zeropsio
Francesco Ciulla@FrancescoCiull4

We are hiring at @zeropsio! We are expanding the DevRel team and hiring for two critical roles: - Technical DevRel Engineer - Developer Advocate (Community Builder) 100% remote. Full descriptions are available at the link below. I'll go live later to talk about this

English
10
10
101
9.6K
dinesh (evm/acc) 🇮🇳 retweetledi
Paarug Sethi
Paarug Sethi@paarugsethi·
good folks of blr, this is a bittersweet post. i’m moving out — looking for someone to occupy this room in a gated society in domlur. - 1 bedroom w/o attached washroom (dedicated washroom right outside the room) - lots of sunlight + AC - 3 BHK on the ground floor with 2 other male flatmates - huge, gated society with a swimming pool, clubhouse, tennis courts, garden and a lot of peace - 2 mins drive from 100ft road - rent 24k/month
Paarug Sethi tweet mediaPaarug Sethi tweet mediaPaarug Sethi tweet mediaPaarug Sethi tweet media
English
33
9
397
86.2K
dinesh (evm/acc) 🇮🇳
more analysis @ hyperliquid.goldrush.dev
Covalent@Covalent_HQ

Yesterday, the S&P 500 $SPX closed at an all-time high. And for the first time in history, you could trade it without a broker or KYC queue Just xyz:SP500 on Hyperliquid -  a permissionless perp DEX where the most iconic index in global finance now trades 24/7 The numbers don't leave much room for debate: • 0.1 bps spread • $423M in 24h volume • Health Score: A - 100/100 (streamed live on our dashboard -> hyperliquid.goldrush.dev) For years, the TradFi establishment repeated the same line: "DeFi can't match execution quality. The rails aren't ready. Real capital will never touch it." Yesterday was the counterargument The settlement lag that defined traditional markets? Gone. The broker gatekeeping? Gone.  The opacity around price quality? Replaced with real-time, verifiable health scores anyone can audit on GoldRush's Hyperliquid Dashboard We haven't just caught up to TradFi. We've removed the friction it was built around.

English
0
0
2
61
Zeeshan
Zeeshan@zeeshan_utd·
Going live in 2 days on @eigencloud , especially with Opus 4.7 release and non - interactive agent friendly update on EigenCompute in place
Zeeshan tweet media
English
2
1
16
585
dinesh (evm/acc) 🇮🇳 retweetledi
Adi
Adi@AdiFlips·
Here in Bangalore for #vibecon by @emergentlabs I am hiring across all roles for my company. Looking to meet great talent. Hmu.
Adi tweet media
English
65
6
396
18.9K
dinesh (evm/acc) 🇮🇳 retweetledi
Covalent
Covalent@Covalent_HQ·
Are you participating in Colosseum Frontier and don't know what to build? Here are 6 ideas 🧵
Covalent tweet media
English
22
11
46
1.8K
Devbose
Devbose@Devbosetwt·
Top of the morning 🌞
Devbose tweet media
English
1
0
4
283
Akshat
Akshat@pieakshat·
built OmniLayer, an agentic system that optimises for USDC yield across multiple EVM chains for @lifiprotocol hackathon > uses @tempo wallet's session keys to sign + execute transactions on behalf of users within spending limits they set. > scans ~400 vaults via lifi earn, routes through lifi composer. splits across pendle fixed yield, high apy, and safe base positions. one tx per cycle. > user picks: fully autonomous or approve each deposit via passkeys (you may or may not trust agents). > no interface needed, users interact with OmniLayer through their claude code or codex instance.
Akshat tweet media
English
12
1
19
1K
epoch.
epoch.@epochdotm·
week-1 update for @colosseum here's what we shipped: - won solana privacy hack - main track + @arcium sidetrack - fresh branding + website - devnet drop soon - alpha right after under the hood: - pools, bets, sides ~ private - positions + payouts ~ private - ciphertext bet submission - blind pool state mutation - admin + agent markets - ppci confidence index - time-locked refunds bet in the dark. settle on-chain. the future of prediction markets.
English
13
3
90
4.9K