cts🌸

3.3K posts

cts🌸 banner
cts🌸

cts🌸

@gf_256

cofounder and hacker @zellic_io and @pb_ctf yt https://t.co/nlNai6iiMP

25 nyc شامل ہوئے Mayıs 2019
924 فالونگ64.7K فالوورز
پن کیا گیا ٹویٹ
cts🌸
cts🌸@gf_256·
crazy find at the huawei store
English
131
390
9K
539.8K
cts🌸
cts🌸@gf_256·
Honored to receive the ETHSecurity Badge. I want to take this time to highlight these other AMAZING recipients who deserve it just as much if not more: - @samczsun, the GOAT, needs no explanation and partly why me and Jazzy founded Zellic - @tayvano_ singlehandedly has helped victims recover tens if not hundreds of millions of stolen funds as a *volunteer* - @pcaversaccio for the countless nights in war rooms and coordinated disclosures as a *volunteer* - @AndrewMohawk an absolute delight to run into every time im at a conference or event - @Montyly Josselin singlehandedly raised the bar for the space back when no one cared about audits other greetz: @Fredrik0x @DanielVF @notdeghost @yoavw Rock on yall
thedao.fund@thedaofund

With no further ado, below are the first batch of applicants that were minted badges today: @samczsun @yoavw @nicht_tintin @GNSPS @montyly @gf_256 @hritzdorf @Fredrik0x @tinchoabbate Gustavo Grieco @AndrewMohawk @iphelix @dxo1312 @SoosMate @rv_inc @0x11b6 @MatthiasEgli @a_permenev @FrankResearcher @DanielVF @sbetamc @RenaudDUBOIS10 @dr_zircuit @notdeghost @1nf0s3cpt @poojaranjan19 @theRaz0r @x86NOP @mattaereal @palinatolmach @k3mmio @donnoh_eth @auryn_macmillan TheDAO Curators also all received an ETHSecurity Badge: @VitalikButerin @GriffGreen @jbaylina @Pol_Lanski @pcaversaccio @avsa @tayvano_

English
1
5
51
5.1K
Sybil
Sybil@runsybil·
The way we hack is changing and we're building what comes next We've raised a total of $40M to create the AI-native platform for offensive security
GIF
English
4
14
57
35.8K
cts🌸
cts🌸@gf_256·
v12 now has PR support (with balatro music)
English
3
2
50
6.7K
𓅃 UAE Exotic Falconry & Finance
𓅃 UAE Exotic Falconry & Finance@FalconryFinance·
this is how we make domestic and international Air travel a thing of the past made his own MANPAD system it looks like
English
49
294
3.4K
246K
cts🌸
cts🌸@gf_256·
@vividvoid One of the most beautiful things I’ve seen this year
English
0
0
8
1.2K
Vivid Void
Vivid Void@vividvoid·
Vivid Void tweet media
ZXX
62
4K
48.2K
637.1K
figamin
figamin@figamin·
i'm happy that one in a while, intense autism still pays off.
figamin tweet media
English
65
1.6K
14.5K
1M
cts🌸
cts🌸@gf_256·
@anneouyang @Standard_Kernel I met Anne in 2019 at CSAW back when she was a student. She’s incredible and I’m glad to see her succeed!
English
0
0
14
1.5K
Anne Ouyang
Anne Ouyang@anneouyang·
Excited to share @Standard_Kernel's seed round and some reflections on what we’ve learned about kernel generation and what we believe is next. Grateful to our amazing team, supporters, and the broader community pushing this space forward.
Anne Ouyang tweet media
English
45
44
508
120.8K
Chef_AI
Chef_AI@itschef_ai·
@zellic_io @latentholdings Not sure how many people deploying solidity/any contract vs how many people were in 21-24’ but seems like a great app. Do you plan to expand this to infosec or just web3sec?
English
1
0
0
1.3K
Zellic
Zellic@zellic_io·
It only cost $3.79. That’s how much @LatentHoldings spent to audit 804 lines of code with V12. In 32 minutes, V12 found: - 1 high-severity - 1 medium-severity - 2 low-severity issues Let’s take a look at the high-severity bug.
Zellic tweet media
English
8
3
153
36.9K
cts🌸 ری ٹویٹ کیا
cts🌸
cts🌸@gf_256·
reverse engineers be like
cts🌸 tweet media
English
12
26
575
32.1K
cts🌸
cts🌸@gf_256·
all CTF players rn
cts🌸 tweet media
English
6
19
380
22.4K
cts🌸
cts🌸@gf_256·
this joke was generously provided to me by my friend Ananth all credit goes to him
cts🌸 tweet media
English
0
1
18
2.7K
cts🌸
cts🌸@gf_256·
Claude and Codex max walk into a bar. That’s the end of the joke. Claude hit the usage limit
English
27
121
3.3K
97.7K
cts🌸
cts🌸@gf_256·
@vnwgi you uploaded a codebase that doesn't build. can you upload the entire repository including the build system (Foundry, hardhat, etc)
English
0
0
0
277
cts🌸
cts🌸@gf_256·
"Multiplication is 12x faster than addition" based based based based based based based based based based based based based based based based based based based based based based based based based based based based based based based based based based based based based based based b
cts🌸 tweet media
English
19
36
1.3K
85.9K
cts🌸
cts🌸@gf_256·
@vnwgi link me your run ID
English
1
0
1
11K
Fuck
Fuck@vnwgi·
@gf_256 Just all in $50 on V12: 13 criticals, 0 PoCs. Is V12 a security agent or a horror writer? Most look like false positives, but one feels like the Golden Bug. @gf_256, why is V12 gatekeeping the PoCs? Help a brother out
English
1
0
2
11.1K
leni_aurelia
leni_aurelia@leni_aurelia_·
@gf_256 Hey! I'm short form video editor and I'd love to help with this. Can we connect in DMs so I can share you my portfolio
English
1
0
0
454