@EE_Bhandup @BhandupMSEDCL @cebhandup No electricity supply in Bhatipada & Keshavji nagar area of Bhandup west for more than 1 hr. Please send your personnel for restoration of electricity supply to this area...
English
1
0
0
0
Victor Immanuvel
Victor Immanuvel@VictorImmanuve5·
@MAHAVITARAN A senior citizen couple who is in below poverty line has been charged Rs. 30000 as monthly bill. How is that possible? When checked with your billing dept. in Bhandup, they r giving evry other reason for the bill to be high. Ven there is hardly any consumption
English
4
1
1
0
Sachin Mahajan
Sachin Mahajan@scmonline1·
@sdo4733 @EE_Bhandup @cebhandup @MSEDCL Sir, As per attached I have filed complaint about faulty meter more than month ago Receiving averaged bills. Now nobody is occupying the flat and still I get high bill based on average. Can you please rectify or replace the meter ASAP.
Sachin Mahajan tweet media
English
1
0
1
0
sdo4733_Bhandup(E)
sdo4733_Bhandup(E)@sdo4733·
@EE_Bhandup @VictorImmanuve5 @MAHAVITARAN accucheck of meter is in working condition having is copy of accucheck report for your persual so as per 3 dec. 20 photo,accucheck report and verification report this office issued provisional bill of rs. 18760/- for consumption of 2913 unit's in 9 months so please cooperates
English
6
0
0
0
sdo4733_Bhandup(E)
sdo4733_Bhandup(E)@sdo4733·
@EE_Bhandup @VictorImmanuve5 @MAHAVITARAN Sir, with connection to above matter, Consumer No. 000054260121 has received Bill of Rs. 31350/-. After verification by Section office & this office had take bill correction entry in billing system and 2913 unit split up in 9 months i.e. April to Dec. 20 for average billing.
sdo4733_Bhandup(E) tweet mediasdo4733_Bhandup(E) tweet media
English
2
0
0
0
sdo4733_Bhandup(E)
sdo4733_Bhandup(E)@sdo4733·
@vanzf11 @cebhandup @NitinRaut_INC Sir, Yesterday 11 KV DAV College feeder was faulty & Today, 22 KV Lokpriya 1 Feeder was faulty at same time 11 KV Janta Market feeder also tripped ... Now all Faults are cleared. & Power supply is in normal condition
English
0
0
1
0
vanessa
vanessa@vanzf11·
@cebhandup @NitinRaut_INC after power failure in Mumbai the electricity goes off in Bhandup East Dattar colony area everyday for 2 hours. Why!!!!????? I
English
2
0
0
0
sdo4733_Bhandup(E)
sdo4733_Bhandup(E)@sdo4733·
@avi_1308 @EE_Bhandup @CMOMaharashtra As well as purpose of msedcl company of above connection is to avoid the Theft of Energy pl note As well as whenever action is taken by Bmc Dept on above spot due to footpath of road Then above meter is removed & to be stored.
English
0
0
0
0
sdo4733_Bhandup(E)
sdo4733_Bhandup(E)@sdo4733·
@avi_1308 @EE_Bhandup @CMOMaharashtra Sir, As per information given by Datar Colony Section In-charge, above connection is on footpath of road hence above connection is given as a slum connection that means papers of these connections are not valid in the future plan.
English
1
0
0
0
Arvind
Arvind@avi_1308·
@sdo4733 @EE_Bhandup @EE_Bhandup @CMOMaharashtra u were not aware of court case. As per process,technician should visit place & mark a place for meter. In past,Place of meter was decided on society compound without society's permission. So meter allotment done in 2019is not valid
Arvind tweet mediaArvind tweet mediaArvind tweet mediaArvind tweet media
sdo4733_Bhandup(E)@sdo4733

@avi_1308 @EE_Bhandup @MSEDCL @CMOMaharashtra @gentl_reminder @mumbaimatterz @mybmcWardS Sir, It is to inform that the said connection is not residential but issued connection for commercial activity i.e panbidi shop with minimum documents required as per electricity act 2003 section 43.

Mumbai, India 🇮🇳 English
3
0
0
0
Arvind
Arvind@avi_1308·
@sdo4733 @EE_Bhandup @MSEDCL @CMOMaharashtra now when you know case is in court, why can't you undo your wrong thing? @gentl_reminder @mumbaimatterz @mybmcWardS even knowing fact, u are least bother to take action. & Providing worst reasoning.
sdo4733_Bhandup(E)@sdo4733

@avi_1308 @cebhandup @MSEDCL @mybmcWardS @mybmc @abpmajhatv @mumbaimatterz @CMOMaharashtra @SunilRaut65 Sir, at the time of releasing connection there is not known, there is court case as well as at that connection releasing time there is no objection from anybody hence connection is released & meter is installed on wall.

Mumbai, India 🇮🇳 English
3
1
0
0
Arvind
Arvind@avi_1308·
@sdo4733 @cebhandup @CMOMaharashtra @EE_Bhandup @MSEDCL @CMDMSEDCL sir we have raised concern on 6/12/2019. Why don't you take action at that time or revert via letter to us.There is no premises available. It's on footpath. Also revert pending on residential proof point.
Arvind tweet media
sdo4733_Bhandup(E)@sdo4733

@avi_1308 @cebhandup @MSEDCL @mybmcWardS @mybmc @abpmajhatv @mumbaimatterz @CMOMaharashtra @SunilRaut65 Sir, after your complaint it is requested from you to remove this meter from the wall hence meter is removed & installed in consumer premises. At now after decision of court further necessary action will be taken as per court order.

Mumbai, India 🇮🇳 English
1
0
0
0
Arvind
Arvind@avi_1308·
@sdo4733 @cebhandup @MSEDCL @mybmcWardS @mybmc @abpmajhatv @mumbaimatterz @CMOMaharashtra @SunilRaut65 we appreciate meter shifting from our compound wall. will you please provide reason why it is alloted in first place, when you know the matter is with court as confirmed by you.
Arvind tweet media
sdo4733_Bhandup(E)@sdo4733

@Ashay08559298 @cebhandup @MSEDCL @EE_Bhandup @CMDMSEDCL @mybmcWardS Sir, As per your complaint the installed meter on wall of building is shifted on dated 05.10.2020 by personally visiting by officers for resolving dispute.

Mumbai, India 🇮🇳 English
7
3
2
0
Ashay
Ashay@AshayKawle·
@cebhandup @MSEDCL @EE_Bhandup @CMDMSEDCL @mybmcWardS To remove illegal meter you r waiting for court decision, but to allot and install on our building wall you immediately approve it knowing matter is in court. Thats shows double standards. Requesting you to remove it.
Arvind@avi_1308

@cebhandup @MSEDCL @EE_Bhandup @CMDMSEDCL @SunilRaut65 @mybmcWardS @AUThackeray @sdo4733 action awaited from mseb dept even after knowing the case is with court they have alloted illegal meter with fake documents. @SunilRaut65 sir require your help to resolve issue.

English
2
0
0
0
Arvind
Arvind@avi_1308·
Letter submitted to take action against fraud documents submitted at your office by Mr gaurav Mukund pandey. No action taken yet. @EE_Bhandup @cebhandup @MSEDCL @CMDMSEDCL @sdo4733 @AUThackeray @mybmcWardS
Arvind tweet mediaArvind tweet media
Arvind@avi_1308

@sdo4733 @mybmc @EE_Bhandup @MSEDCL @AUThackeray @CMDMSEDCL no action 4m electricity bhandup division,Who has installed unauthorized meter on d nirvana compoundwall without collecting whole set of documents. & Doesn't even bother to take any action when matter is highlight 2 them

Mumbai, India 🇮🇳 English
1
6
0
0
Shibа lnu
Shibа lnu@Shib6029·
@sdo4733 @mybmcWardS @mybmc @cebhandup .. we are sure and confident that as an organisation.. you would not want to support some officers with questionable repute and will stand to your true core values and do and support upright matters.. Let's veed out the wrong here.
Arvind@avi_1308

@sdo4733 @mybmcWardS @mybmc @cebhandup it seems that no pancard copy collected at your end while accepting fraud application submitted by Mr Pandey. Pure negligence at work @sdo4733. How much time u required to fetch file & share pan card copy of applicant?